ABSTRACT
This dissertation introduces a real-time topology monitoring scheme for power systems intended to provide enhanced situational awareness during major system disturbances. The topology monitoring scheme requires accurate real-time topology information to be effective. This scheme is supported by advances in transmission line outage detection based on data-mining phasor measurement unit (PMU) measurements.
A network flow analysis scheme is proposed to track changes in user defined minimal cut sets within the system. This work introduces a new algorithm used to update a previous network flow solution after the loss of a single system branch. The proposed new algorithm provides a significantly decreased solution time that is desired in a real- time environment. This method of topology monitoring can provide system operators with visual indications of potential problems in the system caused by changes in topology.
This work also presents a method of determining all singleton cut sets within a given network topology called the one line remaining (OLR) algorithm. During operation, if a singleton cut set exists, then the system cannot withstand the loss of any one line and still remain connected. The OLR algorithm activates after the loss of a transmission line and determines if any singleton cut sets were created. These cut sets are found using properties of power transfer distribution factors and minimal cut sets.
The topology analysis algorithms proposed in this work are supported by line outage detection using PMU measurements aimed at providing accurate real-time topology information. This process uses a decision tree (DT) based data-mining approach to characterize a lost tie line in simulation. The trained DT is then used to analyze PMU measurements to detect line outages. The trained decision tree was applied to real PMU measurements to detect the loss of a 500 kV line and had no misclassifications.
The work presented has the objective of enhancing situational awareness during significant system disturbances in real time. This dissertation presents all parts of the proposed topology monitoring scheme and justifies and validates the methodology using a real system event.
This dissertation introduces a real-time topology monitoring scheme for power systems intended to provide enhanced situational awareness during major system disturbances. The topology monitoring scheme requires accurate real-time topology information to be effective. This scheme is supported by advances in transmission line outage detection based on data-mining phasor measurement unit (PMU) measurements.
A network flow analysis scheme is proposed to track changes in user defined minimal cut sets within the system. This work introduces a new algorithm used to update a previous network flow solution after the loss of a single system branch. The proposed new algorithm provides a significantly decreased solution time that is desired in a real- time environment. This method of topology monitoring can provide system operators with visual indications of potential problems in the system caused by changes in topology.
This work also presents a method of determining all singleton cut sets within a given network topology called the one line remaining (OLR) algorithm. During operation, if a singleton cut set exists, then the system cannot withstand the loss of any one line and still remain connected. The OLR algorithm activates after the loss of a transmission line and determines if any singleton cut sets were created. These cut sets are found using properties of power transfer distribution factors and minimal cut sets.
The topology analysis algorithms proposed in this work are supported by line outage detection using PMU measurements aimed at providing accurate real-time topology information. This process uses a decision tree (DT) based data-mining approach to characterize a lost tie line in simulation. The trained DT is then used to analyze PMU measurements to detect line outages. The trained decision tree was applied to real PMU measurements to detect the loss of a 500 kV line and had no misclassifications.
The work presented has the objective of enhancing situational awareness during significant system disturbances in real time. This dissertation presents all parts of the proposed topology monitoring scheme and justifies and validates the methodology using a real system event.
ContributorsWerho, Trevor Nelson (Author) / Vittal, Vijay (Thesis advisor) / Heydt, Gerald (Committee member) / Hedman, Kory (Committee member) / Karady, George G. (Committee member) / Arizona State University (Publisher)
Created2015

Description
Understanding the graphical structure of the electric power system is important
in assessing reliability, robustness, and the risk of failure of operations of this criti-
cal infrastructure network. Statistical graph models of complex networks yield much
insight into the underlying processes that are supported by the network. Such gen-
erative graph models are also capable of generating synthetic graphs representative
of the real network. This is particularly important since the smaller number of tradi-
tionally available test systems, such as the IEEE systems, have been largely deemed
to be insucient for supporting large-scale simulation studies and commercial-grade
algorithm development. Thus, there is a need for statistical generative models of
electric power network that capture both topological and electrical properties of the
network and are scalable.
Generating synthetic network graphs that capture key topological and electrical
characteristics of real-world electric power systems is important in aiding widespread
and accurate analysis of these systems. Classical statistical models of graphs, such as
small-world networks or Erd}os-Renyi graphs, are unable to generate synthetic graphs
that accurately represent the topology of real electric power networks { networks
characterized by highly dense local connectivity and clustering and sparse long-haul
links.
This thesis presents a parametrized model that captures the above-mentioned
unique topological properties of electric power networks. Specically, a new Cluster-
and-Connect model is introduced to generate synthetic graphs using these parameters.
Using a uniform set of metrics proposed in the literature, the accuracy of the proposed
model is evaluated by comparing the synthetic models generated for specic real
electric network graphs. In addition to topological properties, the electrical properties
are captured via line impedances that have been shown to be modeled reliably by well-studied heavy tailed distributions. The details of the research, results obtained and
conclusions drawn are presented in this document.
in assessing reliability, robustness, and the risk of failure of operations of this criti-
cal infrastructure network. Statistical graph models of complex networks yield much
insight into the underlying processes that are supported by the network. Such gen-
erative graph models are also capable of generating synthetic graphs representative
of the real network. This is particularly important since the smaller number of tradi-
tionally available test systems, such as the IEEE systems, have been largely deemed
to be insucient for supporting large-scale simulation studies and commercial-grade
algorithm development. Thus, there is a need for statistical generative models of
electric power network that capture both topological and electrical properties of the
network and are scalable.
Generating synthetic network graphs that capture key topological and electrical
characteristics of real-world electric power systems is important in aiding widespread
and accurate analysis of these systems. Classical statistical models of graphs, such as
small-world networks or Erd}os-Renyi graphs, are unable to generate synthetic graphs
that accurately represent the topology of real electric power networks { networks
characterized by highly dense local connectivity and clustering and sparse long-haul
links.
This thesis presents a parametrized model that captures the above-mentioned
unique topological properties of electric power networks. Specically, a new Cluster-
and-Connect model is introduced to generate synthetic graphs using these parameters.
Using a uniform set of metrics proposed in the literature, the accuracy of the proposed
model is evaluated by comparing the synthetic models generated for specic real
electric network graphs. In addition to topological properties, the electrical properties
are captured via line impedances that have been shown to be modeled reliably by well-studied heavy tailed distributions. The details of the research, results obtained and
conclusions drawn are presented in this document.
ContributorsHu, Jiale (Author) / Sankar, Lalitha (Thesis advisor) / Vittal, Vijay (Committee member) / Scaglione, Anna (Committee member) / Arizona State University (Publisher)
Created2015

Description
For a (N+1)-bus power system, possibly 2N solutions exists. One of these solutions
is known as the high-voltage (HV) solution or operable solution. The rest of the solutions
are the low-voltage (LV), or large-angle, solutions.
In this report, a recently developed non-iterative algorithm for solving the power-
flow (PF) problem using the holomorphic embedding (HE) method is shown as
being capable of finding the HV solution, while avoiding converging to LV solutions
nearby which is a drawback to all other iterative solutions. The HE method provides a
novel non-iterative procedure to solve the PF problems by eliminating the
non-convergence and initial-estimate dependency issues appeared in the traditional
iterative methods. The detailed implementation of the HE method is discussed in the
report.
While published work focuses mainly on finding the HV PF solution, modified
holomorphically embedded formulations are proposed in this report to find the
LV/large-angle solutions of the PF problem. It is theoretically proven that the proposed
method is guaranteed to find a total number of 2N solutions to the PF problem
and if no solution exists, the algorithm is guaranteed to indicate such by the oscillations
in the maximal analytic continuation of the coefficients of the voltage power series
obtained.
After presenting the derivation of the LV/large-angle formulations for both PQ
and PV buses, numerical tests on the five-, seven- and 14-bus systems are conducted
to find all the solutions of the system of nonlinear PF equations for those systems using
the proposed HE method.
After completing the derivation to find all the PF solutions using the HE method, it
is shown that the proposed HE method can be used to find only the of interest PF solutions
(i.e. type-1 PF solutions with one positive real-part eigenvalue in the Jacobian
matrix), with a proper algorithm developed. The closet unstable equilibrium point
(UEP), one of the type-1 UEP’s, can be obtained by the proposed HE method with
limited dynamic models included.
The numerical performance as well as the robustness of the proposed HE method is
investigated and presented by implementing the algorithm on the problematic cases and
large-scale power system.
is known as the high-voltage (HV) solution or operable solution. The rest of the solutions
are the low-voltage (LV), or large-angle, solutions.
In this report, a recently developed non-iterative algorithm for solving the power-
flow (PF) problem using the holomorphic embedding (HE) method is shown as
being capable of finding the HV solution, while avoiding converging to LV solutions
nearby which is a drawback to all other iterative solutions. The HE method provides a
novel non-iterative procedure to solve the PF problems by eliminating the
non-convergence and initial-estimate dependency issues appeared in the traditional
iterative methods. The detailed implementation of the HE method is discussed in the
report.
While published work focuses mainly on finding the HV PF solution, modified
holomorphically embedded formulations are proposed in this report to find the
LV/large-angle solutions of the PF problem. It is theoretically proven that the proposed
method is guaranteed to find a total number of 2N solutions to the PF problem
and if no solution exists, the algorithm is guaranteed to indicate such by the oscillations
in the maximal analytic continuation of the coefficients of the voltage power series
obtained.
After presenting the derivation of the LV/large-angle formulations for both PQ
and PV buses, numerical tests on the five-, seven- and 14-bus systems are conducted
to find all the solutions of the system of nonlinear PF equations for those systems using
the proposed HE method.
After completing the derivation to find all the PF solutions using the HE method, it
is shown that the proposed HE method can be used to find only the of interest PF solutions
(i.e. type-1 PF solutions with one positive real-part eigenvalue in the Jacobian
matrix), with a proper algorithm developed. The closet unstable equilibrium point
(UEP), one of the type-1 UEP’s, can be obtained by the proposed HE method with
limited dynamic models included.
The numerical performance as well as the robustness of the proposed HE method is
investigated and presented by implementing the algorithm on the problematic cases and
large-scale power system.
ContributorsMine, Yō (Author) / Tylavsky, Daniel (Thesis advisor) / Armbruster, Dieter (Committee member) / Holbert, Keith E. (Committee member) / Sankar, Lalitha (Committee member) / Vittal, Vijay (Committee member) / Undrill, John (Committee member) / Arizona State University (Publisher)
Created2015

Description
Power flow calculation plays a significant role in power system studies and operation. To ensure the reliable prediction of system states during planning studies and in the operating environment, a reliable power flow algorithm is desired. However, the traditional power flow methods (such as the Gauss Seidel method and the Newton-Raphson method) are not guaranteed to obtain a converged solution when the system is heavily loaded.
This thesis describes a novel non-iterative holomorphic embedding (HE) method to solve the power flow problem that eliminates the convergence issues and the uncertainty of the existence of the solution. It is guaranteed to find a converged solution if the solution exists, and will signal by an oscillation of the result if there is no solution exists. Furthermore, it does not require a guess of the initial voltage solution.
By embedding the complex-valued parameter α into the voltage function, the power balance equations become holomorphic functions. Then the embedded voltage functions are expanded as a Maclaurin power series, V(α). The diagonal Padé approximant calculated from V(α) gives the maximal analytic continuation of V(α), and produces a reliable solution of voltages. The connection between mathematical theory and its application to power flow calculation is described in detail.
With the existing bus-type-switching routine, the models of phase shifters and three-winding transformers are proposed to enable the HE algorithm to solve practical large-scale systems. Additionally, sparsity techniques are used to store the sparse bus admittance matrix. The modified HE algorithm is programmed in MATLAB. A study parameter β is introduced in the embedding formula βα + (1- β)α^2. By varying the value of β, numerical tests of different embedding formulae are conducted on the three-bus, IEEE 14-bus, 118-bus, 300-bus, and the ERCOT systems, and the numerical performance as a function of β is analyzed to determine the “best” embedding formula. The obtained power-flow solutions are validated using MATPOWER.
This thesis describes a novel non-iterative holomorphic embedding (HE) method to solve the power flow problem that eliminates the convergence issues and the uncertainty of the existence of the solution. It is guaranteed to find a converged solution if the solution exists, and will signal by an oscillation of the result if there is no solution exists. Furthermore, it does not require a guess of the initial voltage solution.
By embedding the complex-valued parameter α into the voltage function, the power balance equations become holomorphic functions. Then the embedded voltage functions are expanded as a Maclaurin power series, V(α). The diagonal Padé approximant calculated from V(α) gives the maximal analytic continuation of V(α), and produces a reliable solution of voltages. The connection between mathematical theory and its application to power flow calculation is described in detail.
With the existing bus-type-switching routine, the models of phase shifters and three-winding transformers are proposed to enable the HE algorithm to solve practical large-scale systems. Additionally, sparsity techniques are used to store the sparse bus admittance matrix. The modified HE algorithm is programmed in MATLAB. A study parameter β is introduced in the embedding formula βα + (1- β)α^2. By varying the value of β, numerical tests of different embedding formulae are conducted on the three-bus, IEEE 14-bus, 118-bus, 300-bus, and the ERCOT systems, and the numerical performance as a function of β is analyzed to determine the “best” embedding formula. The obtained power-flow solutions are validated using MATPOWER.
ContributorsLi, Yuting (Author) / Tylavsky, Daniel J (Thesis advisor) / Undrill, John (Committee member) / Vittal, Vijay (Committee member) / Arizona State University (Publisher)
Created2015

Description
The standard optimal power flow (OPF) problem is an economic dispatch (ED) problem combined with transmission constraints, which are based on a static topology. However, topology control (TC) has been proposed in the past as a corrective mechanism to relieve overloads and voltage violations. Even though the benefits of TC are presented by several research works in the past, the computational complexity associated with TC has been a major deterrent to its implementation. The proposed work develops heuristics for TC and investigates its potential to improve the computational time for TC for various applications. The objective is to develop computationally light methods to harness the flexibility of the grid to derive maximum benefits to the system in terms of reliability. One of the goals of this research is to develop a tool that will be capable of providing TC actions in a minimal time-frame, which can be readily adopted by the industry for real-time corrective applications.
A DC based heuristic, i.e., a greedy algorithm, is developed and applied to improve the computational time for the TC problem while still maintaining the ability to find quality solutions. In the greedy algorithm, an expression is derived, which indicates the impact on the objective for a marginal change in the state of a transmission line. This expression is used to generate a priority list with potential candidate lines for switching, which may provide huge improvements to the system. The advantage of this method is that it is a fast heuristic as compared to using mixed integer programming (MIP) approach.
Alternatively, AC based heuristics are developed for TC problem and tested on actual data from PJM, ERCOT and TVA. AC based N-1 contingency analysis is performed to identify the contingencies that cause network violations. Simple proximity based heuristics are developed and the fast decoupled power flow is solved iteratively to identify the top five TC actions, which provide reduction in violations. Time domain simulations are performed to ensure that the TC actions do not cause system instability. Simulation results show significant reductions in violations in the system by the application of the TC heuristics.
A DC based heuristic, i.e., a greedy algorithm, is developed and applied to improve the computational time for the TC problem while still maintaining the ability to find quality solutions. In the greedy algorithm, an expression is derived, which indicates the impact on the objective for a marginal change in the state of a transmission line. This expression is used to generate a priority list with potential candidate lines for switching, which may provide huge improvements to the system. The advantage of this method is that it is a fast heuristic as compared to using mixed integer programming (MIP) approach.
Alternatively, AC based heuristics are developed for TC problem and tested on actual data from PJM, ERCOT and TVA. AC based N-1 contingency analysis is performed to identify the contingencies that cause network violations. Simple proximity based heuristics are developed and the fast decoupled power flow is solved iteratively to identify the top five TC actions, which provide reduction in violations. Time domain simulations are performed to ensure that the TC actions do not cause system instability. Simulation results show significant reductions in violations in the system by the application of the TC heuristics.
ContributorsBalasubramanian, Pranavamoorthy (Author) / Hedman, Kory W (Thesis advisor) / Vittal, Vijay (Committee member) / Ayyanar, Raja (Committee member) / Sankar, Lalitha (Committee member) / Arizona State University (Publisher)
Created2016

Description
Two significant trends of recent power system evolution are: (1) increasing installa-tion of dynamic loads and distributed generation resources in distribution systems; (2) large-scale renewable energy integration at the transmission system level. A majority of these devices interface with power systems through power electronic converters. However, existing transient stability (TS) simulators are inadequate to represent the dynamic behavior of these devices accurately. On the other hand, simulating a large system using an electromagnetic transient (EMT) simulator is computationally impractical. EMT-TS hybrid simulation approach is an alternative to address these challenges. Furthermore, to thoroughly analyze the increased interactions among the transmission and distribution systems, an integrated modeling and simulation approach is essential.
The thesis is divided into three parts. The first part focuses on an improved hybrid simulation approach and software development. Compared to the previous work, the pro-posed approach has three salient features: three-sequence TS simulation algorithm, three-phase/three-sequence network equivalencing and flexible switching of the serial and par-allel interaction protocols.
The second part of the thesis concentrates on the applications of the hybrid simula-tion tool. The developed platform is first applied to conduct a detailed fault-induced de-layed voltage recovery (FIDVR) study on the Western Electricity Coordinating Council (WECC) system. This study uncovers that after a normally cleared single line to ground fault at the transmission system could cause air conditioner motors to stall in the distribu-tion systems, and the motor stalling could further propagate to an unfaulted phase under certain conditions. The developed tool is also applied to simulate power systems inter-faced with HVDC systems, including classical HVDC and the new generation voltage source converter (VSC)-HVDC system.
The third part centers on the development of integrated transmission and distribution system simulation and an advanced hybrid simulation algorithm with a capability of switching from hybrid simulation mode to TS simulation. Firstly, a modeling framework suitable for integrated transmission and distribution systems is proposed. Secondly, a power flow algorithm and a diakoptics based dynamic simulation algorithm for the integrated transmission and distribution system are developed. Lastly, the EMT-TS hybrid simulation algorithm is combined with the diakoptics based dynamic simulation algorithm to realize flexible simulation mode switching to increase the simulation efficiency.
The thesis is divided into three parts. The first part focuses on an improved hybrid simulation approach and software development. Compared to the previous work, the pro-posed approach has three salient features: three-sequence TS simulation algorithm, three-phase/three-sequence network equivalencing and flexible switching of the serial and par-allel interaction protocols.
The second part of the thesis concentrates on the applications of the hybrid simula-tion tool. The developed platform is first applied to conduct a detailed fault-induced de-layed voltage recovery (FIDVR) study on the Western Electricity Coordinating Council (WECC) system. This study uncovers that after a normally cleared single line to ground fault at the transmission system could cause air conditioner motors to stall in the distribu-tion systems, and the motor stalling could further propagate to an unfaulted phase under certain conditions. The developed tool is also applied to simulate power systems inter-faced with HVDC systems, including classical HVDC and the new generation voltage source converter (VSC)-HVDC system.
The third part centers on the development of integrated transmission and distribution system simulation and an advanced hybrid simulation algorithm with a capability of switching from hybrid simulation mode to TS simulation. Firstly, a modeling framework suitable for integrated transmission and distribution systems is proposed. Secondly, a power flow algorithm and a diakoptics based dynamic simulation algorithm for the integrated transmission and distribution system are developed. Lastly, the EMT-TS hybrid simulation algorithm is combined with the diakoptics based dynamic simulation algorithm to realize flexible simulation mode switching to increase the simulation efficiency.
ContributorsHuang, Qiuhua (Author) / Vittal, Vijay (Thesis advisor) / Undrill, John M. (Committee member) / Heydt, Gerald T. (Committee member) / Ayyanar, Raja (Committee member) / Arizona State University (Publisher)
Created2016

Description
This work presents research on practices in the day-ahead electric energy market, including replication practices and reliability coordinators used by some market operators to demonstrate the impact these practices have on market outcomes. The practice of constraint relaxations similar to those an Independent System Operator (ISO) might perform in day-ahead market models is implemented. The benefits of these practices are well understood by the industry; however, the implications these practices have on market outcomes and system security have not been thoroughly investigated. By solving a day-ahead market model with and without select constraint relaxations and comparing the resulting market outcomes and possible effects on system security, the effect of these constraint relaxation practices is demonstrated.
Proposed market solutions are often infeasible because constraint relaxation practices and approximations that are incorporated into market models. Therefore, the dispatch solution must be corrected to ensure its feasibility. The practice of correcting the proposed dispatch solution after the market is solved is known as out-of-market corrections (OMCs), defined as any action an operator takes that modifies a proposed day-ahead dispatch solution to ensure operating and reliability requirements. The way in which OMCs affect market outcomes is illustrated through the use of different corrective procedures. The objective of the work presented is to demonstrate the implications of these industry practices and assess the impact these practices have on market outcomes.
Proposed market solutions are often infeasible because constraint relaxation practices and approximations that are incorporated into market models. Therefore, the dispatch solution must be corrected to ensure its feasibility. The practice of correcting the proposed dispatch solution after the market is solved is known as out-of-market corrections (OMCs), defined as any action an operator takes that modifies a proposed day-ahead dispatch solution to ensure operating and reliability requirements. The way in which OMCs affect market outcomes is illustrated through the use of different corrective procedures. The objective of the work presented is to demonstrate the implications of these industry practices and assess the impact these practices have on market outcomes.
ContributorsAl-Abdullah, Yousef Mohammad (Author) / Hedman, Kory W (Thesis advisor) / Vittal, Vijay (Thesis advisor) / Heydt, Gerald T (Committee member) / Sankar, Lalitha (Committee member) / Arizona State University (Publisher)
Created2016

Description
Constraint relaxation by definition means that certain security, operational, or financial constraints are allowed to be violated in the energy market model for a predetermined penalty price. System operators utilize this mechanism in an effort to impose a price-cap on shadow prices throughout the market. In addition, constraint relaxations can serve as corrective approximations that help in reducing the occurrence of infeasible or extreme solutions in the day-ahead markets. This work aims to capture the impact constraint relaxations have on system operational security. Moreover, this analysis also provides a better understanding of the correlation between DC market models and AC real-time systems and analyzes how relaxations in market models propagate to real-time systems. This information can be used not only to assess the criticality of constraint relaxations, but also as a basis for determining penalty prices more accurately.
Constraint relaxations practice was replicated in this work using a test case and a real-life large-scale system, while capturing both energy market aspects and AC real-time system performance. System performance investigation included static and dynamic security analysis for base-case and post-contingency operating conditions. PJM peak hour loads were dynamically modeled in order to capture delayed voltage recovery and sustained depressed voltage profiles as a result of reactive power deficiency caused by constraint relaxations. Moreover, impacts of constraint relaxations on operational system security were investigated when risk based penalty prices are used. Transmission lines in the PJM system were categorized according to their risk index and each category was as-signed a different penalty price accordingly in order to avoid real-time overloads on high risk lines.
This work also extends the investigation of constraint relaxations to post-contingency relaxations, where emergency limits are allowed to be relaxed in energy market models. Various scenarios were investigated to capture and compare between the impacts of base-case and post-contingency relaxations on real-time system performance, including the presence of both relaxations simultaneously. The effect of penalty prices on the number and magnitude of relaxations was investigated as well.
Constraint relaxations practice was replicated in this work using a test case and a real-life large-scale system, while capturing both energy market aspects and AC real-time system performance. System performance investigation included static and dynamic security analysis for base-case and post-contingency operating conditions. PJM peak hour loads were dynamically modeled in order to capture delayed voltage recovery and sustained depressed voltage profiles as a result of reactive power deficiency caused by constraint relaxations. Moreover, impacts of constraint relaxations on operational system security were investigated when risk based penalty prices are used. Transmission lines in the PJM system were categorized according to their risk index and each category was as-signed a different penalty price accordingly in order to avoid real-time overloads on high risk lines.
This work also extends the investigation of constraint relaxations to post-contingency relaxations, where emergency limits are allowed to be relaxed in energy market models. Various scenarios were investigated to capture and compare between the impacts of base-case and post-contingency relaxations on real-time system performance, including the presence of both relaxations simultaneously. The effect of penalty prices on the number and magnitude of relaxations was investigated as well.
ContributorsSalloum, Ahmed (Author) / Vittal, Vijay (Thesis advisor) / Hedman, Kory (Thesis advisor) / Heydt, Gerald (Committee member) / Ayyanar, Raja (Committee member) / Arizona State University (Publisher)
Created2016

Description
The grounding system in a substation is used to protect personnel and equipment. When there is fault current injected into the ground, a well-designed grounding system should disperse the fault current into the ground in order to limit the touch potential and the step potential to an acceptable level defined by the IEEE Std 80. On the other hand, from the point of view of economy, it is desirable to design a ground grid that minimizes the cost of labor and material. To design such an optimal ground grid that meets the safety metrics and has the minimum cost, an optimal ground grid application was developed in MATLAB, the OptimaL Ground Grid Application (OLGGA).
In the process of ground grid optimization, the touch potential and the step potential are introduced as nonlinear constraints in a two layer soil model whose parameters are set by the user. To obtain an accurate expression for these nonlinear constraints, the ground grid is discretized by using a ground-conductor (and ground-rod) segmentation method that breaks each conductor into reasonable-size segments. The leakage current on each segment and the ground potential rise (GPR) are calculated by solving a matrix equation involving the mutual resistance matrix. After the leakage current on each segment is obtained, the touch potential and the step potential can be calculated using the superposition principle.
A genetic algorithm is used in the optimization of the ground grid and a pattern search algorithm is used to accelerate the convergence. To verify the accuracy of the application, the touch potential and the step potential calculated by the MATLAB application are compared with those calculated by the commercialized grounding system analysis software, WinIGS.
The user's manual of the optimal ground grid application is also presented in this work.
In the process of ground grid optimization, the touch potential and the step potential are introduced as nonlinear constraints in a two layer soil model whose parameters are set by the user. To obtain an accurate expression for these nonlinear constraints, the ground grid is discretized by using a ground-conductor (and ground-rod) segmentation method that breaks each conductor into reasonable-size segments. The leakage current on each segment and the ground potential rise (GPR) are calculated by solving a matrix equation involving the mutual resistance matrix. After the leakage current on each segment is obtained, the touch potential and the step potential can be calculated using the superposition principle.
A genetic algorithm is used in the optimization of the ground grid and a pattern search algorithm is used to accelerate the convergence. To verify the accuracy of the application, the touch potential and the step potential calculated by the MATLAB application are compared with those calculated by the commercialized grounding system analysis software, WinIGS.
The user's manual of the optimal ground grid application is also presented in this work.
ContributorsLi, Songyan (Author) / Tylavsky, Daniel J. (Thesis advisor) / Ayyanar, Raja (Committee member) / Vittal, Vijay (Committee member) / Arizona State University (Publisher)
Created2016

Description
Present distribution infrastructure is designed mainly for uni-directional power flow with well-controlled generation. An increase in the inverter-interfaced photovoltaic (PV) systems requires a thorough re-examination of the design, operation, protection and control of distribution systems. In order to understand the impact of high penetration of PV generation, this work conducts an automated and detailed modeling of a power distribution system. The simulation results of the modeled distribution feeder have been verified with the field measurements.
Based on the feeder model, this work studies the impact of the PV systems on voltage profiles under various scenarios, including reallocation of the PV systems, reactive power support from the PV inverters, and settings of the load-tap changing transformers in coordination with the PV penetration. Design recommendations have been made based on the simulation results to improve the voltage profiles in the feeder studied.
To carry out dynamic studies related to high penetration of PV systems, this work proposes a differential algebraic equation (DAE) based dynamic modeling and analysis method. Different controllers including inverter current controllers, anti-islanding controllers and droop controllers, are designed and tested in large systems. The method extends the capability of the distribution system analysis tools, to help conduct dynamic analyses in large unbalanced distribution systems.
Another main contribution of this work is related to the investigation of the PV impacts on the feeder protection coordination. Various protection coordination types, including fuse-fuse, recloser-fuse, relay-fuse and relay-recloser have been studied. The analyses provide a better understanding of the relay and recloser settings under different configurations of the PV interconnection transformers, PV penetration levels, and fault types.
A decision tree and fuzzy logic based fault location identification process has also been proposed in this work. The process is composed of the off-line training of the decision tree, and the on-line analysis of the fault events. Fault current contribution from the PV systems, as well as the variation of the fault resistance have been taken into consideration. Two actual fault cases with the event data recorded were used to examine the effectiveness of the fault identification process.
Based on the feeder model, this work studies the impact of the PV systems on voltage profiles under various scenarios, including reallocation of the PV systems, reactive power support from the PV inverters, and settings of the load-tap changing transformers in coordination with the PV penetration. Design recommendations have been made based on the simulation results to improve the voltage profiles in the feeder studied.
To carry out dynamic studies related to high penetration of PV systems, this work proposes a differential algebraic equation (DAE) based dynamic modeling and analysis method. Different controllers including inverter current controllers, anti-islanding controllers and droop controllers, are designed and tested in large systems. The method extends the capability of the distribution system analysis tools, to help conduct dynamic analyses in large unbalanced distribution systems.
Another main contribution of this work is related to the investigation of the PV impacts on the feeder protection coordination. Various protection coordination types, including fuse-fuse, recloser-fuse, relay-fuse and relay-recloser have been studied. The analyses provide a better understanding of the relay and recloser settings under different configurations of the PV interconnection transformers, PV penetration levels, and fault types.
A decision tree and fuzzy logic based fault location identification process has also been proposed in this work. The process is composed of the off-line training of the decision tree, and the on-line analysis of the fault events. Fault current contribution from the PV systems, as well as the variation of the fault resistance have been taken into consideration. Two actual fault cases with the event data recorded were used to examine the effectiveness of the fault identification process.
ContributorsTang, Yingying (Author) / Ayyanar, Raja (Thesis advisor) / Karady, George G. (Committee member) / Heydt, Gerald (Committee member) / Vittal, Vijay (Committee member) / Arizona State University (Publisher)
Created2016